A. Cost estimating
B. Allocating resources
C. Product verification
D. Activity estimating
answer => C
A. Cost estimating
B. Allocating resources
C. Product verification
D. Activity estimating
answer => C
A. Limited in scope
B. Minimal planning resources
C. Generic cost controls
D. Project wide focus
answer => D
A. Prevention cost
B. Appraisal cost
C. Internal failure cost
D. External failure cost
answer => C

A. The process is not in control and should be adjusted.
B. The process is in control and should not be adjusted.
C. The value of R is too high at 11 ..
D. The value for X bar is outside the control limits.
answer => A
A. Inputs to quality control.
B. Outputs from quality control.
C. Inputs to quality assurance.
D. Outputs from quality assurance.
answer => A
A. Cause and effect diagram
B. Sampling inspection
C. Pareto diagram
D. Quality critical path
answer => C
A. Design of experiments
B. Continuous improvement
C. Quality audits
D. Inspections
answer => C
A. Edward Deming
B. Philip Crosby
C. Juran
D. Pareto
answer => A
A. Quality Assurance
B. Quality Control
C. Quality Planning
D. Quality Review
answer => A