A. Cost estimating
B. Allocating resources
C. Product verification
D. Activity estimating

answer => C

A. Limited in scope
B. Minimal planning resources
C. Generic cost controls
D. Project wide focus

answer => D

A. Prevention cost
B. Appraisal cost
C. Internal failure cost
D. External failure cost

answer => C

quality

A. The process is not in control and should be adjusted.
B. The process is in control and should not be adjusted.
C. The value of R is too high at 11 ..
D. The value for X bar is outside the control limits.

answer => A

A. Inputs to quality control.
B. Outputs from quality control.
C. Inputs to quality assurance.
D. Outputs from quality assurance.

answer => A

A. Cause and effect diagram
B. Sampling inspection
C. Pareto diagram
D. Quality critical path

answer => C

A. Design of experiments
B. Continuous improvement
C. Quality audits
D. Inspections

answer =>

A. Edward Deming
B. Philip Crosby
C. Juran
D. Pareto

answer =>  A

A. Quality Assurance
B. Quality Control
C. Quality Planning
D. Quality Review

answer => A