  1. Sbh

    A production process has been defined as part of an industrial equipment manufacturing project. The process is intended to produce steel bolts with a length of 20 cm. The control limits are 19.955cm and 20.045cm.
    The measurements made at the end of the process yielded the following results:

    20.033cm, 19.982cm, 19,995cm, 20.006cm, 19.970cm, 19.968cm, 19.963cm, 19.958cm, 19.962cm, 19.979cm, 19.959cm.

    What should be done?

    The process is under control. It should not be adjusted.
    A special cause should be investigated, the process should be adjusted.
    The control limits should be adjusted.
    The measuring equipment should be recalibrated.

    How is the calculation for this